Waste reduction initiatives at Tauhara
We’ve been working to make our Tauhara Geothermal Power Station site as sustainable as possible, with various waste reduction and waste elimination initiatives.
Read MoreWe’ve been working to make our Tauhara Geothermal Power Station site as sustainable as possible, with various waste reduction and waste elimination initiatives.
Read MoreWe visited WasteCo’s Christchurch sorting facility to find out what happens to waste that goes into general site waste skips.
Read MoreNaylor Love is offering free access to a carbon calculator developed to help its clients visualise the potential carbon impacts of construction material choices.
Read MoreWe had some great conversations with rangatahi and their parents about a career in construction at the NZ Careers Expo at TSB Bank Arena in Wellington.
Read MoreWe’re working behind the scenes at Wellington Regional Hospital to replace and upgrade the entire water reticulation system. By using the latest technology, we’re completing a very invasive procedure as painlessly as possible!
Read MoreAlongside the copper pipe replacement project, we’re also refurbishing over 1200 square metres to deliver brand new Urology and Renal departments at Wellington Regional Hospital, using some of the latest construction technology to ensure that the job runs smoothly.
Read More